Hospital Cloud Migration: A Three-Phase Approach
How Kite migrates hospitals to AWS: assessment, target environment, migration in waves. What each phase delivers and what the hospital contributes.
We migrate hospitals in three phases, based on the AWS Migration Acceleration Program (MAP): first decide on the basis of reliable figures, then build the foundation, then move in waves. Each phase ends with a result that the next one builds on. We settle the difficult questions about vendors, C5 and resilience at the start, not in the middle of the migration.
At a glance
- The approach follows the three MAP phases: Assess, Mobilize, and Migrate & Modernize.1
- The assessment takes around three months and ends with a decision document for the management board and supervisory board.
- We implement the requirements of Section 393 SGB V once in the landing zone, not separately for each application.
- We migrate in waves and modernise only afterwards. AWS can cover part of the costs if the project is registered early.
| Phase | Result | What the hospital contributes |
|---|---|---|
| Assess | Decision document: strategy per application, target architecture, business case, roadmap | Export of the virtual environment, IT cost plan including planned replacements, application list with owners and vendors, licence and maintenance contracts with terms, time from IT operations and the information security officer |
| Mobilize | C5-compliant landing zone, operating model, wave plan, successful pilot migration | Decisions on operational responsibility, a contact person per application |
| Migrate & Modernize | Applications migrated in waves, documented modernisation opportunities | Cutover windows, testing by the business units after each wave |
How does a hospital cloud migration start?
With a decision based on reliable figures rather than estimates. In the assessment, we clarify whether the cloud is the better choice for the specific application landscape, at what cost and in what order.
After a short kick-off, we analyse the export of the virtual environment, the IT cost plan and the application list. This way, the first workshop starts with hypotheses instead of empty spreadsheets. In it, each application is assigned one of seven migration strategies, the “7 Rs”: rehost, replatform, relocate, repurchase, refactor, retain or retire.2 At the same time, we capture the dependencies between applications, because they later determine the order of the waves. We then talk to the most important software vendors about operating models and licences. A second, on-site workshop brings together target architecture, business case and roadmap.
Two rules make the cost comparison reliable. First, only externally purchased services count, not in-house staff. Second, we value infrastructure at replacement cost, not book value, because depreciated hardware still has to be replaced at some point.
What is different in a hospital?
Two questions determine speed and cost in hospital IT, and both belong in the assessment.
Vendors have a say. For the hospital information system (HIS), the picture archive (PACS), and laboratory and document management systems, the vendor’s operating model and approval determine which options exist. Some applications are better replaced by the vendor’s SaaS offering; some systems with long maintenance contracts stay on premises until the contract ends. If these conversations only take place during the migration, the schedule slips.
Recovery objectives before cloud prices. Many contingency plans bridge several days of IT outage. That describes the maximum tolerable downtime, not the target for how quickly an application should be running again. Because resilience is the biggest cost lever in any cloud architecture, we work with the information security officer to assign applications to a few criticality classes, and each class to a suitable recovery pattern. This way, the business case calculates the right level of resilience per application, not the most expensive one for all.
What has to be in place before migrating?
A target environment with compliance built in, and clarity about operations. Under Section 393 SGB V, healthcare providers may process health data in the cloud only if a current C5 attestation exists for the cloud systems used and the criteria for customers listed in the audit report have been implemented.3 C5 is the BSI’s criteria catalogue for cloud services. Our Healthcare Landing Zone translates these customer criteria into technical controls: regions outside the EU are blocked, only C5-attested services are permitted, compliance is checked continuously, logs are centralised, and every area has its own account. Compliance thus becomes a property of the platform and does not have to be re-checked for each application. The hospital’s other security requirements continue to apply, for instance from NIS-2 and the sector-specific security standard B3S.
The target environment includes the operating model: who patches, backs up and monitors, according to which runbooks and with which cost controls. A pilot migration of a selected application runs through the whole process once before the first wave starts.
How do you migrate while the hospital keeps running?
In waves, with cutover windows that fit the hospital’s routines. The order follows from the dependencies already captured in the assessment. For each migration pattern there is a runbook covering preparation, execution, verification and cutover. After each wave, lessons learned flow back into the runbooks, so each wave is more predictable than the last.
We migrate first and modernise afterwards: changing things while moving them mixes two risks. We record modernisation opportunities during the migration and address them in a separate phase. After the migration, we can take over operations if desired.
What can AWS co-fund?
Part of the costs, if the project is registered in time. MAP is not only a methodology but also a funding programme: AWS provides tools, training and financial investment to offset initial migration costs.1 AWS decides for each project individually whether and in what form it is funded. The amount depends mainly on the expected scale of cloud usage after the migration.
Timing is decisive: projects that have already been awarded or started are no longer eligible. Raise the topic while the project has not yet been awarded. A migration without funding follows the same steps.
How Kite helps
Kite migrated Fachklinikum Mainschleife, the first hospital in Germany to run its entire infrastructure on AWS. We support all three phases, from the assessment to operations afterwards, and clarify early with AWS whether funding is an option for your project.
Further reading
- C5:2026: What Healthcare Software Vendors Must Do Now
- Kite Is a Launch Partner of the AWS European Sovereign Cloud
Sources
- AWS, Migration Acceleration Program: aws.amazon.com
- AWS Prescriptive Guidance, migration strategies (7 Rs): docs.aws.amazon.com
- Section 393 SGB V: gesetze-im-internet.de